Primary School Livingston

In 2015 we have finished the construction of Primary School Livingston, aimed to provide modern tuition for students. The whole structure contains a system of air recuperation, which provides the air exchange in all rooms, maintaining fresh and clean air for students and teachers. Furthermore, we have added a system of air conditioning to the whole building which adds extra comfort by lowering the inside temperature during the high summer heat waves. We have also installed solar panels for the water heating on the roof of the school. The building itself also collects rainwater which is than used for the irrigation system watering the green areas.

The roof was made for walking and is used as playground and provides further tuition space with a nice view on the city.